Commissioning
Drawings show intent. Commissioning proves performance. Our Cx team delivers third-party and basis-of-design commissioning across new construction, retrofits, and existing buildings, turning installed systems into operating systems, with a turnover package that holds up under the first audit, the first cold snap, and the first ten years of operation.
We commission everything from cleanrooms to data centers to building enclosures, and because our commissioning agents are design engineers, functional testing goes beyond the checklist to whether the system actually serves the building.
Our Approach
How We Work
Commissioning starts at the OPR and ends after the warranty season, not at substantial completion. Pre-functional checklists, functional performance tests, and systems integration testing are documented so the owner inherits proof, not promises.
- OPR / BOD development & design-phase reviews
- Functional performance testing & integration testing
- Seasonal testing through the warranty period
Service Capabilities
A.Commissioning Types
- New construction commissioning (NCCx)
- Retro-commissioning (RCx)
- Existing building commissioning (EBCx)
- Monitoring-based commissioning (MBCx)
- Building enclosure commissioning (BECx)
- Recommissioning & ongoing commissioning
- LEED fundamental & enhanced commissioning
B.Specialty & High-Stakes
- Cleanroom & cGMP commissioning support
- Healthcare commissioning (FGI / ASHRAE 170)
- Data center commissioning (Levels 1–5)
- Smoke control system commissioning
- Fire protection acceptance testing oversight
- Electrical system commissioning
- Systems integration testing (SIT)
C.Process & Documentation
- Owner's project requirements (OPR) development
- Basis of design (BOD) review
- Pre-functional checklists & testing protocols
- Functional performance testing (FPT)
- Systems manual & turnover documentation
- Operator training & post-occupancy support
- IAQ & indoor environmental verification
- Warranty-period seasonal testing
Why Owners Choose KeRi
Independent Verification
Third-party objectivity backed by design-engineer depth, we know what right looks like because we design it.
Documented Performance
Test records, trend data, and systems manuals that survive audits, LEED review, and operator turnover.
Operator Handoff
Training and documentation aimed at the people who will run the building for the next decade.